- Dec 7, 2016
- 2
- 0
- 1,510
Currently I'm trying to change the boot order and run a Windows 8.1 media creation tool from a 32gb flash drive for an ASUS x551m i have updated the bios for the laptop, and i am currently trying to change the UEFI order on the bios in order to get Windows 8 to re-installed and fixed, Also getting the proper instructions to get the media creation tool to work and doing it right.
